The final phase of the Main Street reconstruction project for the section between Foch Bridge and Chesley Street, including Dock Street, is scheduled to begin on May 13, 2024, and continue until the end of November 2024. At a construction cost of approximately $9.1 million, the project aims to modernize and upgrade the water supply, sanitary sewer, and stormwater infrastructure along Main Street, benefiting Shediac residents. Additionally, asphalt, curbs, sidewalks, and property are included in the project scope.

Throughout the duration of the project, traffic management will be diligently overseen by a dedicated traffic control division. Two-way traffic flow will be maintained on Main Street, ensuring minimal disruption to the daily commutes of residents and businesses. However, Dock Street will remain closed to through traffic for the duration of the construction.

Updates:

W23 Plan

Given the size and scope of the work, challenges may arise, and residents should anticipate some traffic delays even with two-way traffic as Main Street does become congested in peak season even with no construction. Residents are strongly advised to plan for additional travel time accordingly.

It is important to note that throughout the project duration, businesses in the area will remain accessible to patrons.

Residents will retain access to their driveways for parking purposes on a daily basis. However, in instances where work is immediately in front of a property, designated temporary parking areas will be assigned for affected residents on those days.

We appreciate your cooperation and patience during this period of infrastructure enhancement. Should you have any inquiries or require further information, please do not hesitate to contact the Town of Shediac at 506 532-7000 or by email at This email address is being protected from spambots. You need JavaScript enabled to view it..